BROAD OAKSumner House

Renewed plant.
Better control throughout.

A complete heating refurbishment for Progress Housing Group, renewing Sumner House’s boiler plant, replacing 68 radiators and bringing building controls and gas safety systems together through Broad Oak’s in-house team.

Mechanical. Electrical. Renewable.Delivering nationwide
ProjectSumner House
ExpertiseMechanical & electrical
SectorProperty services
LocationLeyland, Lancashire
Client
Progress Housing Group
Site
Sumner House, King Street, Leyland
01The challenge

The challenge.
Understood.

The refurbishment needed to address the whole heating system: boiler plant, distribution, radiators, controls and safety. New equipment also had to work with retained pipework, with a clear handover for the building’s operators.

Sumner House, Leyland — restored archive exterior photograph.
Sumner House, Leyland — restored archive exterior photograph.
02What we delivered

Expertise.
In every detail.

We stripped out the boiler room and installed new boiler plant and flues, extending the refurbishment through the building with 68 radiator replacements and new valves. Our team installed and commissioned the BMS, completed the associated electrical works and integrated the gas solenoid with the fire alarm. We flushed and treated the system, insulated pipework and recommissioned the retained heating circuits alongside the new installation. Testing, electrical certification, valve records and operator training completed the handover, giving Progress Housing Group one team responsible for the connected works.

  • Boiler-room strip-out, new boiler plant and flues
  • 68 new radiators with replacement valves
  • In-house BMS installation and commissioning
  • Integrated gas solenoid and fire-alarm controls
  • Electrical installation, testing and certification
  • System cleaning, water treatment and operator handover
03The result

The difference.
Delivered.

Sumner House received a heating refurbishment that extended beyond the boiler room. Renewed plant and radiators were brought together with the BMS and safety controls, while commissioning records and operator training supported the transition into day-to-day use.

68New radiators
BMSIn-house controls delivery
GasIntegrated safety controls
O&MOperator handover
NEXTLet’s build what’s next

Your next project.
Our next conversation.

Let’s talk

Our accreditations

Quality. Safety. Professional standards.

  • ISO 14001 logo
  • ISO 9001 logo
  • Gas Safe Register logo
  • Constructionline logo
  • CHAS logo
  • NICEIC logo
  • HETAS logo
  • MCS logo

Choose whether this site can remember your featured projects. Your choice is kept for 90 days. You can change it using Cookie settings in the footer.

There are no analytics or advertising trackers on this site. Cookie policy · Privacy policy