BROAD OAKOld School Court

Renewed plant.
Reassurance for residents.

Broad Oak replaced the commercial boilers at Old School Court for Housing Plus Group, renewing 360 kW of heating capacity and integrating updated plant room safety controls around occupied homes.

Mechanical. Electrical. Renewable.Delivering nationwide
ProjectOld School Court
ExpertiseMechanical & electrical
SectorResidential & social housing
LocationUK residential development
01The challenge

The challenge.
Understood.

Ageing boilers served approximately 40 apartments and communal areas. The replacement needed to renew the central heating plant and its safety arrangements while accounting for the needs of residents.

Old School Court — Broad Oak Vaillant boiler installation for Housing Plus Group.
Old School Court — Broad Oak Vaillant boiler installation for Housing Plus Group.
02What we delivered

Expertise.
In every detail.

Working with Housing Plus Group and principal designer Morgan and Lambert, we replaced three 120 kW Hamworthy boilers with three 120 kW Vaillant ecoTEC boilers. The upgrade renewed the building’s 360 kW boiler installation and brought the supporting plant room arrangements up to date. We integrated fire alarm, gas and carbon monoxide interlocks as part of the work, connecting the new plant with the building’s safety systems. Installation was coordinated around resident services, bringing the boiler replacement and associated safety upgrades together within one refurbishment.

  • Three 120 kW commercial boilers replaced
  • New Vaillant ecoTEC boiler installation
  • Associated plant room installation upgraded
  • Fire alarm, gas and carbon monoxide interlocks integrated
  • Installation coordinated around occupied homes
03The result

The difference.
Delivered.

Old School Court gained renewed commercial boiler plant and integrated safety controls serving its apartments and communal spaces. The completed upgrade gave Housing Plus Group a modern heating installation with the supporting safety arrangements brought together as part of the same project.

3New commercial boilers
360 kWCombined boiler capacity
NEXTLet’s build what’s next

Your next project.
Our next conversation.

Let’s talk

Our accreditations

Quality. Safety. Professional standards.

  • ISO 14001 logo
  • ISO 9001 logo
  • Gas Safe Register logo
  • Constructionline logo
  • CHAS logo
  • NICEIC logo
  • HETAS logo
  • MCS logo

Choose whether this site can remember your featured projects. Your choice is kept for 90 days. You can change it using Cookie settings in the footer.

There are no analytics or advertising trackers on this site. Cookie policy · Privacy policy