BROAD OAKThe Guinness Partnership

81 homes.
One connected upgrade.

Broad Oak renewed the communal heating network serving 81 sheltered housing dwellings in Edgeley, combining plant room, distribution and in-home upgrades across four occupied residential blocks.

Mechanical. Electrical. Renewable.Delivering nationwide
ProjectThe Guinness Partnership
ExpertiseHeat networks
SectorResidential & social housing
LocationEdgeley, Stockport
01The challenge

The challenge.
Understood.

Ageing communal heating needed replacement across four occupied residential blocks. The work had to connect central plant with individual homes, with the programme coordinated around residents and their essential heating and hot-water services.

Trent Court, Edgeley — watercolour artist’s impression.
Trent Court, Edgeley — watercolour artist’s impression.
02What we delivered

Expertise.
In every detail.

Appointed by FairHeat on behalf of The Guinness Partnership, we upgraded the plant rooms at Trent Court and Kinder Court and renewed the network serving the estate. Our team installed high-efficiency boilers, thermal stores and building management controls alongside new distribution mains, risers and dwelling connections. New heat interface units brought the central network into individual homes for heating and hot water. We coordinated the plant, pipework, controls and in-home installations as one programme, taking the completed network through testing and commissioning in an occupied residential setting.

  • Plant rooms refurbished at Trent Court and Kinder Court
  • High-efficiency boilers, thermal stores and BMS installed
  • Distribution mains, risers and dwelling connections renewed
  • Heat interface units installed for heating and hot water
  • Network testing and commissioning
03The result

The difference.
Delivered.

The estate now has a modern low-temperature network connecting central plant to 81 homes. Integrated controls and renewed distribution infrastructure give the housing provider a stronger foundation for day-to-day operation, future maintenance and the introduction of lower-carbon heat.

81Sheltered housing dwellings
4Residential blocks
NEXTLet’s build what’s next

Your next project.
Our next conversation.

Let’s talk

Our accreditations

Quality. Safety. Professional standards.

  • ISO 14001 logo
  • ISO 9001 logo
  • Gas Safe Register logo
  • Constructionline logo
  • CHAS logo
  • NICEIC logo
  • HETAS logo
  • MCS logo

Choose whether this site can remember your featured projects. Your choice is kept for 90 days. You can change it using Cookie settings in the footer.

There are no analytics or advertising trackers on this site. Cookie policy · Privacy policy