BROAD OAKBolton Court

Modern plant.
Control at every level.

Broad Oak renewed Bolton Court’s heating plant for Progress Housing Group in Leyland, installing twin commercial boilers, upgraded hydraulic equipment and local controls, together with a new flue liner through the building’s existing riser.

Mechanical. Electrical. Renewable.Delivering nationwide
ProjectBolton Court
ExpertiseMechanical & electrical
SectorResidential & social housing
LocationLeyland, Lancashire
Client
Progress Housing Group
Site
Bolton Court, Leyland
Boiler plant
Potterton Sirius Three
01The challenge

The challenge.
Understood.

The replacement plant had to work with the building’s existing layout, including a vertical flue route. The project brought boiler-room equipment, local heating controls and high-level flue installation into one coordinated delivery.

Newton Close, Leyland — watercolour artist’s impression of the Progress Housing scheme.
Newton Close, Leyland — watercolour artist’s impression of the Progress Housing scheme.
02What we delivered

Expertise.
In every detail.

We installed two 90 kW Potterton Sirius Three boilers, providing 180 kW of combined capacity, alongside a Grundfos MAGNA3 twin-head pump assembly and Mikrofill pressurisation equipment. New expansion vessels, filtration and water treatment supported the hydraulic installation, while 20 motorised two-port valves and programmable thermostats renewed local heating control. Our team integrated gas proving and detection and installed a new flue liner through the existing vertical riser. This included the boiler-header connection, support bracketry, high-level access and weather sealing, bringing the complete installation together within the existing building.

  • Two 90 kW Potterton Sirius Three boilers
  • Twin-head circulation pump and renewed pressurisation equipment
  • Expansion vessels, filtration and water treatment
  • 20 motorised control valves and programmable thermostats
  • Integrated gas proving and gas detection
  • New flue liner, supports and weather sealing
03The result

The difference.
Delivered.

The completed works gave Bolton Court renewed boiler capacity, circulation and heating controls, with a new flue installation fitted to the existing riser. Plant, hydraulics and gas safety were delivered as a connected system, with the building’s layout carried through into the installation detail.

2New commercial boilers
180kW combined capacity
20New control valves
1New flue liner
NEXTLet’s build what’s next

Your next project.
Our next conversation.

Let’s talk

Our accreditations

Quality. Safety. Professional standards.

  • ISO 14001 logo
  • ISO 9001 logo
  • Gas Safe Register logo
  • Constructionline logo
  • CHAS logo
  • NICEIC logo
  • HETAS logo
  • MCS logo

Choose whether this site can remember your featured projects. Your choice is kept for 90 days. You can change it using Cookie settings in the footer.

There are no analytics or advertising trackers on this site. Cookie policy · Privacy policy